BW Henderson Electrical carried out the electrical fit-out for Te Karaka Station & Lodge. The lodge sits on a working station at Waikaretu, inland from Port Waikato. Main contractor Pukekohe Builders engaged us for the lodge build. Since then, we have also worked directly for the station across the wider site.
The lodge fit-out alone ran to more than 850 hours on site. The scope covered power and lighting throughout the lodge, the mains installation, and the mechanical side, including bathroom extract fans.
We also ran cabling for exterior lighting and ducting for communications. That way, the station can extend the site later without reopening finished work.
The property has its own generation. So we supplied and installed the generator along with the low-voltage mains. Later, we extended the generator exhaust as the site developed. In addition, we wired a separate tiny home on the station as its own job.
Our EWRB-registered electricians worked to Master Electricians Quality Assured standards and backed the job with our workmanship guarantee. Finally, we tested and certified every circuit before handover.
Since the main build finished, we have stayed on as the station’s electrician. For example, we have added new circuits for refrigeration and a septic pump. We have also fault-found the generator, sorted hot water in the staff accommodation and run power out to a tiny house.
On a rural property this far from town, an electrician who already knows the switchboard and the generator saves a great deal of time. Port Waikato and Waikaretu sit outside the area we usually cover. Even so, a project of this size and length is worth the run.
In short, this electrical fit-out in Port Waikato is a good example of the rural and off-grid end of our commercial electrical work.