BW Henderson Electrical carried out the full aged care electrical fit-out at CHT Karaka, a new 60-bed aged care home in Karaka, South Auckland. We worked for main contractor Argon Constructors and spent about a year on site, from temporary construction power through to handover.
The home has three two-storey wings. Care levels run from rest home through to hospital level and secure dementia care.
We did the lot: switchboards, lighting, nurse call, emergency lighting and data. First, we set up temporary power for the construction site. Then we installed the mains supply, including an extra mains run from the pit to the transformer.
Inside, we wired the power and lighting through all three wings. We also installed 38 night lights, with controls in each area switchboard, so corridors stay softly lit for residents at night. In addition, we installed the data cabling, the data and nurse call cabinet, and the emergency and exit lighting.
In aged care, every one of those systems matters more than usual. For example, nurse call has to work every single time. The lighting also has to suit residents at 3am and staff on a full shift. Finally, the emergency lighting has to be signed off before anyone moves in.
During the build we also handled test and tag for the site offices. Since handover, we have looked after the warranty call-backs.
Bring us in at the design stage, so the electrical design suits residents and staff from day one. Call 09 298 1944 or book a job online.